{"product_id":"clemco-revisions-set-system-fur-systeme-mit-1-1-4-kessel-mit-fsv-oder-quantum-und-apollo-600","title":"Service kit, for systems with a 1 1\/4\" tank featuring FSV, Quantum, or Apollo-600","description":"\u003cdiv style=\"max-width:980px;margin:0 auto;line-height:1.65;color:#222;\"\u003e\n\u003ch5\u003eClemco Service Kit System – for 1 1\/4-inch boilers with FSV or Quantum and Apollo-600\u003c\/h5\u003e\n\u003cp\u003eThe Clemco Service Kit System is designed as a comprehensive maintenance kit for compatible pressure blasting systems with 1 1\/4-inch tank piping, an FSV or Quantum metering valve, and an Apollo-600 respiratory protection system. It facilitates the simultaneous overhaul of blasting and safety-related system components.\u003c\/p\u003e\n\u003cp\u003eBundled maintenance facilitates predictable upkeep and reduces the risk of worn seals or system components going unnoticed until they fail during operation. Exact compatibility must be confirmed based on the tank model, serial number, metering valve, and Apollo-600 version.\u003c\/p\u003e\n\u003cdiv style=\"background:#f5f5f7;border-radius:10px;padding:15px 17px;margin:18px 0;\"\u003e\n\u003cstrong\u003eYour Benefits\u003c\/strong\u003e\u003cbr\u003e✅ Comprehensive system service kit\u003cbr\u003e✅ For 1 1\/4-inch tanks with FSV or Quantum\u003cbr\u003e✅ Inclusion of the Apollo-600 system\u003cbr\u003e✅ For predictable preventive maintenance\u003cbr\u003e✅ Original Clemco system classification\u003cbr\u003e✅ Supports operational safety and equipment availability\u003c\/div\u003e\n\u003chr\u003e\n\u003ch5\u003eTechnical Classification\u003c\/h5\u003e\n\u003cdiv style=\"overflow-x:auto;border:1px solid #d9dee3;border-radius:10px;margin:16px 0;\"\u003e\u003ctable style=\"width:100%;border-collapse:separate;border-spacing:0;min-width:680px;\"\u003e\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:11px 12px;background:#eef1f3;font-weight:700;\"\u003eProduct Type\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003eSystem Revision Set\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"background:#f8f9fa;\"\u003e\n\u003ctd style=\"padding:11px 12px;font-weight:700;\"\u003eBoiler system\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003e1 1\/4 inches\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:11px 12px;background:#eef1f3;font-weight:700;\"\u003eDosing valve\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003eFSV or Quantum K\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"background:#f8f9fa;\"\u003e\n\u003ctd style=\"padding:11px 12px;font-weight:700;\"\u003eRespirator Cover\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003eClemco Apollo-600\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:11px 12px;background:#eef1f3;font-weight:700;\"\u003eItem Number\u003c\/td\u003e\n\u003ctd style=\"padding:11px 12px;\"\u003e27236D\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\u003c\/table\u003e\u003c\/div\u003e\n\u003chr\u003e\n\u003ch5\u003ePoints to Check Before Ordering\u003c\/h5\u003e\n\u003cp\u003e✔ Boiler model, serial number, and year of manufacture\u003c\/p\u003e\n\u003cp\u003e✔ 1 1\/4-inch piping\u003c\/p\u003e\n\u003cp\u003e✔ FSV or Quantum metering valve\u003c\/p\u003e\n\u003cp\u003e✔ Model and year of manufacture of the Apollo-600 system\u003c\/p\u003e\n\u003cp\u003e✔ Existing breathing air components and connections\u003c\/p\u003e\n\u003chr\u003e\n\u003ch5\u003eInspection and Functional Testing\u003c\/h5\u003e\n\u003cp\u003eBefore performing maintenance on the pressure blasting system, completely depressurize it, empty the abrasive media, and disconnect the breathing-air supply. Clean sealing surfaces, threads, valve seats, hoses, and connections, and inspect them for mechanical damage. Respiratory protection components may only be maintained in accordance with the manufacturer’s instructions and repaired using approved parts.\u003c\/p\u003e\n\u003cp\u003eAfter assembly, the system’s airtightness, start\/stop function, complete venting, abrasive metering, and breathing-air supply must be tested separately and then as a whole. Damaged components or those that cannot be clearly identified must not be reused.\u003c\/p\u003e\n\u003chr\u003e\n\u003ch5\u003eFAQ – Frequently Asked Questions\u003c\/h5\u003e\n\u003cp\u003e\u003cstrong\u003eIs the set only for the boiler?\u003c\/strong\u003e\u003cbr\u003eNo, it is intended as a system set related to the Apollo-600 system.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eIs the content identical for each attachment?\u003c\/strong\u003e\u003cbr\u003eThe current bill of materials applies to item 27236D; however, compatibility and specifications must still be verified.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eCan the breathing air system be modified as desired?\u003c\/strong\u003e\u003cbr\u003eNo, safety-critical breathing air components may only be maintained and combined in accordance with Clemco specifications.\u003c\/p\u003e\n\u003c\/div\u003e","brand":"Clemco","offers":[{"title":"Default Title","offer_id":52744541536603,"sku":"27236D","price":393.41,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0876\/8526\/7803\/files\/revisions-set-system-clemco-27236d.jpg?v=1775215819","url":"https:\/\/strahltechnik-express.de\/en-si\/products\/clemco-revisions-set-system-fur-systeme-mit-1-1-4-kessel-mit-fsv-oder-quantum-und-apollo-600","provider":"ABS Strahltechnik","version":"1.0","type":"link"}